Jump to content

Translations:GREAT Redstone Enabled Automatic Transit System/51/en

From CRSS Wiki
Revision as of 04:54, 21 June 2026 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

New Metro lines get made as new districts farther away from the central regions of the Glacier Anarchic Federation are built, and each can have their own unique design differences to accommodate for the different needs of each region, but follow Line 0's design as a base.